Warning: The magic method Preloader_Plus\Preloader_Plus::__wakeup() must have public visibility in /home/hydrosol/public_html/wp-content/plugins/preloader-plus/inc/preloader-plus.php on line 94

Warning: The magic method Preloader_Plus_Pro\Preloader_Plus_Pro::__wakeup() must have public visibility in /home/hydrosol/public_html/wp-content/plugins/preloader-plus/preloader-plus-pro/inc/preloader-plus-pro.php on line 59
HEP Lisets- Hydroelectric Power Plant in Glozhene, Bulgaria - HydroSolarGroup
ВЕЦ Лисец

HEP Lisets

The hydroelectric power plant “HEP Lisets” is owned by the company “Energy Plus Ltd.” This plant started operating in 1934 and is located in the village of Glozhene, Teteven municipality, Lovech region, Bulgaria.

 

Installed capacity: 0.350 Megawatts

Net head: 7.6 meters

3 Machines:
2 vertical pumps in turbine mode
, 160 kW each
Manufactured in:
Ukraine
1 Francis turbine,
70 kW
Brand:
Mayer, Austria

Water intake location: Vit River

 

In the calendar year 2022, Hydroelectric Plant Lisets produced 1848.13926 megawatt-hours of electricity, providing sustainable electricity for the needs of the population and industry in the area.

SEND AN INQUIRY

If you have any questions, inquiries, or if you’d like to learn more about our hydroelectric power projects and sustainable energy initiatives, please don’t hesitate to get in touch with us. We’re here to answer your queries and explore opportunities for a greener future.

Asset 1