ВЕЦ Тича / HEP Ticha

Hep Ticha

The “Ticha” Hydroelectric Power Plant is owned by the company “Tradeom Ltd.” It was commissioned in the distant year of 1951 and is located in the village of Milanovo, Veliki Preslav Municipality, Shumen Region.

 

Installed capacity: 0.580 Megawatts
Net head: 6.2 meters

2 Machines:
Type: Francis turbines, 290 kW each
Brand: Vevey, Switzerland
Water intake location: Golyama Kamchiya River, Dragoevska River, and Ticha Reservoir

 

Over the last 10 years, the HEP “Ticha” has generated over 1,400,000 kilowatt hours of electricity. The plant utilizes the resources of the Golyama Kamchiya River, Dragoevska River, and Ticha Reservoir to produce electric power. This project plays a pivotal role in enhancing the energy infrastructure in the region and contributes to the reduction of the country’s carbon footprint. In the upcoming year of 2024, a photovoltaic plant will be constructed within the territory of HEP “Ticha”.

SEND AN INQUIRY

If you have any questions, inquiries, or if you’d like to learn more about our hydroelectric power projects and sustainable energy initiatives, please don’t hesitate to get in touch with us. We’re here to answer your queries and explore opportunities for a greener future.

Asset 1